Supplier name: Fleet ID Ltd
Publication date: 13th November 2025
Fleet ID Ltd is committed to achieving Net Zero emissions by 2050. We will keep this date under review, bringing it forward if possible as our carbon reduction plans develop.
Baseline Year: 2024/25 (1st April 2024 – 31st March 2025) |
||
|
Additional Details relating to the Baseline Emissions calculations. This report represents the first year of carbon reporting, so the baseline and current year are the same. A subset of Scope 3 Category 1 (Purchased goods and services) emissions is included in the baseline year’s reporting. This subset covers emissions relating to the manufacture and transportation of materials used in the production of Fleet ID Ltd’s vehicle livery products, and packaging materials purchased for outbound distribution. |
||
| Baseline year emissions (tCO2e): | ||
| Scope 1 | 3.49 | |
| Scope 2 | 3.49 | |
| Scope 3 | 66.00 | |
| Included Scope 3 categories | 1. Purchased goods & services | 46.25 |
| 3. Fuel- and energy-related activities | 1.74 | |
| 4. Upstream transportation & distribution | 0.41 | |
| 5. Waste generated in operations | 9.00 | |
| 6. Business travel | 0.001 | |
| 7. Employee commuting | 8.602 | |
| 9. Downstream transportation & distribution | 0.003 | |
| Total Emissions | 72.98 | |
1 Fleet ID Ltd. staff do not conduct business travel in third-party vehicles.
2 Includes emissions from staff teleworking.
3 No fittings of Fleet ID products on client vehicles occurred in 24-25 at the Fleet ID site therefore there are no downstream emissions to report.
Reporting Year: 2024/25 (1st April 2024 – 31st March 2025) |
||
|
Additional Details relating to the reporting emissions calculations. This report represents the first year of carbon reporting, so the baseline and current year are the same. A subset of Scope 3 Category 1 (Purchased goods and services) emissions is included in the current year’s reporting. This subset covers emissions relating to the manufacture and transportation of materials used in the production of Fleet ID Ltd.’s vehicle livery products, and packaging materials purchased for outbound distribution. |
||
| Reporting year emissions (tCO2e): | ||
| Scope 1 | 3.49 | |
| Scope 2 | 3.49 | |
| Scope 3 | 66.00 | |
| Included Scope 3 categories | 1. Purchased goods & services | 46.25 |
| 3. Fuel- and energy-related activities | 1.74 | |
| 4. Upstream transportation & distribution | 0.41 | |
| 5. Waste generated in operations | 9.00 | |
| 6. Business travel | 0.004 | |
| 7. Employee commuting | 8.605 | |
| 9. Downstream transportation & distribution | 0.006 | |
| Total Emissions | 72.98 | |
The organisation is committed to achieving Net Zero emissions by 2050 at the latest. We will keep this date under review, bringing it forward if possible as our carbon reduction plans develop.
Completed Carbon Reduction Initiatives
The following environmental management measures and projects have been completed:
4 Fleet ID Ltd. staff do not conduct business travel in third-party vehicles.
5 Includes emissions from staff teleworking.
6 No fittings of Fleet ID products on client vehicles occurred in 24-25 at the Fleet ID site therefore there are no downstream emissions to report.
Our environmental action plan commits us to the implementation of further measures which we anticipate will reduce the carbon intensity of the organisation, such as:
This Carbon Reduction Plan has been completed in accordance with PPN 006 and associated guidance and reporting standard for Carbon Reduction Plans.
Emissions have been reported and recorded in accordance with the published reporting standard for Carbon Reduction Plans and the GHG Reporting Protocol corporate standard7 and uses the appropriate Government emission conversion factors for greenhouse gas company reporting8.
Scope 1 and Scope 2 emissions have been reported in accordance with SECR requirements (where required), and the required subset of Scope 3 emissions have been reported in accordance with the published reporting standard for Carbon Reduction Plans and the Corporate Value Chain (Scope 3) Standard9.
This Carbon Reduction Plan has been reviewed and signed off by the board of directors (or equivalent management body).
Signed on behalf of the Supplier:
LEE WHITEHEAD OPERATIONS DIRECTOR
Date: 13/11/2025
7 https://ghgprotocol.org/corporate-standard
8 https://www.gov.uk/government/collections/government-conversion-factors-for-company-reporting
9 https://ghgprotocol.org/standards/scope-3-standard